Before we finalize your gate budget, we need to check 4 access needs: fire response, pedestrian exits, service trucks, and utility crews.
That means planning more than the main entrance:
- Fire access: Confirm the opening size, emergency controls, and power-loss procedure with the fire marshal.
- Pedestrian exits: Plan a separate walking route and get the required exit hardware approved.
- Service trucks: Check vehicle sizes, turning room, and pickup routes before adding a second vehicle gate.
- Utility access: Confirm technician entry, equipment clearance, and any dedicated gate requirements with the utility provider.

Then we match each opening to a swing, sliding, or cantilever gate and decide whether it needs automation.
The budget check? Put every approved gate, hardware item, power connection, and installation responsibility in the bid, along with testing and maintenance duties.
Gate selection comes after access requirements. We need approval for <u>your specific installation</u>, not just the gate model.

Commercial Gate Planning: 4 Access Needs Before Bidding
Fire Department Access: Confirm Gate Requirements
Show every gate that crosses the fire access road on the plan set, and label clear openings, overhead clearance, operating direction, and turning areas.
Draw each gate in the open position so reviewers can see whether it blocks any part of the required access path.
Base the design on the jurisdiction-approved opening size, not a standard gate size.
If it isn’t on the drawing set, it isn’t in the bid.
Get written approval from the fire marshal and building department for the opening size, any setbacks, and emergency access controls.
Document commissioning as part of turnover, and confirm whether fire marshal or fire department representatives must attend.
Have the approved emergency opening procedure demonstrated after installation, and ask when retesting is required after repairs, electrical work, or a vehicle strike.

Document how responders will open the gate from the approach side, including the emergency access device and manual operator release.
Spell out what happens during a power failure, how the override works, and the steps to reset the gate. Don’t assume an automated gate will always fail open.
Assign maintenance responsibility before turnover, and keep approvals, operating instructions, and test records together.
Confirm the inspection schedule and out-of-service procedure with the jurisdiction, including how access will be maintained during repairs.
Once the fire gate is documented, move to the pedestrian exit path.
sbb-itb-908b3eb
Pedestrian Egress: Plan a Way Out
Fire access protects responders; pedestrian egress protects occupants.
Mark occupied work areas and every pedestrian exit on the site plan and gate drawings, then trace a path from each work area to an exit that remains usable when vehicle gates are closed.
Have the designer show a separate pedestrian route with its own release method, rather than using the vehicle opening.
For each exit, document the locks, latches, operating direction, lighting, visibility, and accessibility.
Ask the building department which exit hardware is required, including whether you need panic hardware. Do not finalize the hardware until that review is complete.
Matching infill options alone does not establish egress compliance. The designer must still confirm that the gate and required hardware work together for the approved exit arrangement.
Get the pedestrian egress plan approved by the building department and fire marshal before the bid is final.
Include the approved gate and hardware details in the bid package so the exit is priced now.
Once the pedestrian exit is set, map the second vehicle gate.

Hauler and Service Access: Plan the Second Vehicle Gate
With the pedestrian exit set, we can move to the 8-foot truck gate.
Identify every service vehicle before sizing the opening: delivery, waste-removal, fuel, and maintenance trucks serving generators, HVAC, or substations.
Get each provider’s vehicle dimensions and turning requirements before you finalize the layout.
Have your designer show the truck’s route through the opening, with room for turning, gate movement, and waiting.
The plan should also account for grade, drainage, overhead clearance, curbs, landscaping, and snow storage.
Check the layout with the gate fully open, not just closed.
Use a separate service opening when it keeps haulers away from employees and customers.
Trace the route to the unloading or pickup point, and confirm that idling or parked trucks won’t block fire access or pedestrian exits.
Check that the route also leaves room for utility crews.
Document who controls gate access during construction and after turnover, including who opens it for pickups and maintenance visits.
Name who handles access if the service gate operator fails.
Before ordering access-control hardware, verify the service gate’s required emergency release method with the fire marshal.

Utility and Meter Access: Include a Service Gate
Plan utility access before bidding. Mark meters, transformers, generators, and HVAC equipment on the drawing, along with each approved service route.
Separate routine technician access from equipment access, and ask the utility provider whether it requires a dedicated gate.
Have your designer show the required working clearances around the equipment, not just the gate opening. Keep the gate’s swing or travel outside those clearances.
Get approval from the utility provider and building department before the fence plan is approved.
Record which openings serve routine service visits and which must accommodate larger equipment or vehicles, which may require an 8-foot fence for security. A walk gate alone isn’t enough for equipment access.
Document who may enter and who controls access before specifying hardware. Once those needs are clear, match each opening to the right gate type.
Before choosing the frame and infill, confirm the site’s transformer and fire requirements.
Use the FenceTrac guide to fence requirements near electrical transformers, then confirm enclosure material and fire requirements with the utility provider and building department.

Choose the Gate Type for Each Opening
Once you’ve marked the openings on the drawing, choose a gate movement that fits the space at each location.
Automation changes how a gate operates, not its shape.
| Gate choice | Suitable opening | Checks before specifying |
|---|---|---|
| Single swing | Pedestrian access or a smaller entry | Show the full swing arc. Check for level ground and enough post support so the gate opens without hitting the ground. |
| Double swing | Vehicle or hauler access with room for both leaves to open | Show both swing arcs and the center drop-rod placement. Confirm the clear opening before choosing the kit. |
| Cantilever | A wide vehicle entry with limited swing space | Allow enough run-back space for the gate to retract fully. Use the commercial cantilever gate planning guide to plan the layout. |
| Automated operation | Automated vehicle access gate | Confirm opener compatibility, manual operation, emergency override provisions, and what happens during a power loss. |
Use the table to narrow your gate choice before pricing the hardware package.
FenceTrac aluminum gate kits come in standard single and double sizes, and double gates include a drop rod.
Check the double-gate width guide before specifying a standard opening.
FenceTrac also offers custom welded steel, cantilever, rolling, and automated commercial gates.
Confirm your project’s configuration in the guide to cantilever slide gates available through FenceTrac.
Plan automation early so the bid includes mounting and power needs, and review adding an automated opener to a FenceTrac gate.

Gate Drawing Checklist for the Designer
Use this checklist to turn earlier gate decisions into drawing notes and bid items your designer can price.
- [ ] Mark buildings, fence lines, roads, pedestrian paths, dumpsters, meters, transformers, and other service equipment. Tag each opening by its function on the plan.
- [ ] Record fire marshal, building department, and utility approvals for each opening.
- [ ] Label each gate’s movement type and clear opening. Show overhead clearance, swing or travel path, roadway setbacks, and turning room.
- [ ] Show the finished grade at each opening and keep pedestrian routes separate from vehicle travel.
- [ ] Locate power, controls, emergency release, and safety devices. Document approved emergency operation, access to the manual release, and what happens when power fails.
- [ ] Include every bid item in the bid set: gate leaves, posts, foundations, hinges, latches, drop rods where needed, operators, wiring, controls, and finishes. Name who supplies and installs each item.
- [ ] Assign one party to test emergency devices and keep the maintenance log.
- [ ] Match the gate schedule to the approved civil, electrical, and access plans. Carry revisions into the bid set before final pricing.

Confirm Every Gate Before Finalizing the Bid
Before you price the bid, confirm fire access, pedestrian egress, hauler access, and utility access, and settle each requirement with the fire marshal, building department, utility provider, and service providers.
Then match the approved opening to the correct FenceTrac gate and infill, keeping in mind that approval covers the specific installation, not the gate model.
FAQs
Can one gate serve both fire and service access?
A single gate can serve both uses if it meets the site’s fire and service access needs.
Before you finalize the design, confirm the required clear opening, vehicle turning space, and emergency operation with your local fire marshal.
Plan delivery and service traffic so it doesn’t block emergency access.
How can I secure a gate without blocking emergency access?
Use a secure gate with an approved emergency access method so emergency responders can get in.
Before you finalize the design, confirm the emergency access method, clear opening, and operation during a power outage with your local fire marshal.
If your perimeter is locked, also confirm pedestrian egress requirements with your building department so people have a safe way out.
What if gate requirements change after bidding?
Confirm the updated requirements with your fire marshal or building department, then work with your designer and the FenceTrac team to revise the gate plan.
Requirements vary by jurisdiction, so get emergency access details confirmed in writing.
Before bidding, identify fire department access, pedestrian egress, hauler access, and utility access to help avoid costly redesigns during permitting.